WORKED EXAMPLE FOR UNLAWFUL BUILDINGS PERTAINING TO
PART III OF THE APPLICATION FORM


 

For this example we have considered a site of 12m x 18m (216Sq.m) dimension, earmarked for residential purpose in Revised Comprehensive Development Plan (RCPD) - 1995 and in C Zone. The building has been built in the year 1998 and being used for Residential purpose. The following measurements are assumed:

Site dimension: 216 Sq meters                            Built up area = 324 Sq. m  
Guidance Value for Builtup Area Rs.5000/- per Sq.m.

Permissible FAR: 1. 25                           Permissible Built up Area = 1.25 x 216 = 270 Sq.m

Box 1. This Box is applicable if you have constructed building in non-converted agricultural land. (You have to pay this fees in addition to fee prescribed in Part I of the application)

Usage of building

Site Area (Sq.m)
(1)

Rate prescribed (Refer Box V)
(2)

Total amount (1x2)

Residential

324

2 X 5000/100

Rs. 32,400/-

Box 2. This Box is applicable if you have constructed building without sanction plan in an approved layout / developed areas and has been built in conformity with Zoning regulations / Building byelaws

Usage of building

Site Area (Sq.m)
(3)

Rate prescribed
(Refer Box VI)
(4)

Total amount (3x4)

NOT APPLICABLE.

Box 3 to Box 6 are applicable for all buildings which have violated Setback and FAR norms

Total setback area to be left as per zoning regulations (prescribed)

Actual Setback area left on all sides

Front : 12.0 X 3.0 = 36.0 sqm

Rear : 12.0X 1.5 = 18.0 sqm

Right : 13.5X 1.5 = 20.25 sqm

Left : 13.5 X1.5= 20.25 sqm

Total = 94.50 Sqm

Front : 12.0 X 2.5 = 30.0 sqm

Rear : 12.0X 1.0 = 12.0 sqm

Right : 13.5X 0.6 = 8.1 sqm

Left : 13.5X 0.6= 8.1 sqm

Total= 58.2Sqm

Actual Setback Area violated = 94.50 - 58.20 = 36.30 Sq.m

Box 3. Computation of Setback violation: Formula to calculate the percentage of setback violation

Percentage of setback violation=

Total area of setbacks violated in all the sides x 100 /
Total area of setbacks on all the sides prescribed

= 36.30 x 100 / 94.50 i.e., 38.41%

Setback Dimensions

Area in sqm

a

Prescribed Setback area

94.50

b

Actual Setback area

58.20

c

Shortage of Setback area (area utilized) (a - b)

36.30

d

Percentage of violation [c/a x 100]

38.41

Box 4 Calculation of regularization fee for Setback violations
( Note: Only the columns applicable are shown)

A

Total Extent of site area utilized due to setback violation (in sqm) Box 3 (c)

36.30 sqm

B

Land rate as per guidance rate

(Gandhi Nagara area GV = 2000 per sq ft or 21520 sqm

(i) Residential Rate : Rs : 21520

Non Residential Rate Rs

NOT APPLICABLE

C

For extent more than 25% but upto 50% (Residential use)

A x B (i) x 25/100

36.30 x 21520x 25/100

i.e Rs. 195294/-

Box 5. Computation of FAR violation: Formula to calculate the percentage of FAR violation

Percentage of FAR violation =

Actual FAR area - Permissible FAR area x 100 / Permissible FAR

= 324 - 270 x 100 / 270 i.e., 20.00%

FAR area in sqm

A

Extent of site

216.00 Sq.m

B

Actual of built up area

324.00 Sq.m

In ratio

Area in sqm

C

Permissible FAR

1.25

270.00

D

Actual built up area [b/a]

1.5

324.00

E

Excess FAR [b-c] area

0.5

54.00

F

Percentage of violation [e/c x 100]

20.00

--

G

Actual violated area i.e.,

Proportion of land area required for the actual excess FAR (e/c) x a Sqm
54 x 216/270 i.e., 43.2 Sq.m

43.20

Box 6 Calculation of regularization fee for FAR violations
(Note only columns that are applicable is shown)

A

Proportion of land area required for the actual excess FAR refer Box 5 (g)

43.20 sqm

B

Land rate as per Guidance Rate

(i) Residential Rate

Rs. 21,520 per sqm

Non-Residential Rate Rs.

NOT APPLICABLE

C

If the FAR violation is less than and upto 25% (Residential use)

A x B (i) x 10/100

43.20 x 21,520 x 0.1

i.e Rs. 92966/-

Total Regularisation fee

= Amount arrived at in Box(1)/Box(2)+Box(4)+Box(6)

=32,400 + 1,95,294 + 92,966

(The total fees must be drawn in favour of Commissioner Bruhat Bengaluru Mahanagara Palike)

 

Rs.3,20,360/-

Scrutinee fee for Building (Rs 2.00 per Square metre)

Total Built up Area (Sq.m)

(5)

Rate per Sq.m (Rs)

(6)

Total

(5x6)

 

324

2.00

Rs.648/-

 

(Obtain a separate DD for scrutiny fee in favour of Commissioner,
Bruhat Bengaluru Mahanagara Palike)

Box V

Rate per Square metre of total Built up area in accordance with % of market value (Guidance rate -2005)

Residential - 2%

Non - Residential - 4%

Box VI

Rate per Square metre of total Built up area in accordance with % of market value (Guidance rate 2005)

Residential - 2%

Non - Residential - 4%

 